Bullseye-L Forum
Would you like to react to this message? Create an account in a few clicks or log in to continue.

Atterbury construction

+6
TonyH
james r chapman
-TT-
weber1b
Danehogle
Al
10 posters

Go down

Atterbury construction Empty Atterbury construction

Post by Al Tue Aug 11, 2020 2:53 pm

Has anyone in the area seen any activity on the Bullseye range construction at Atterbury?

Al

Posts : 622
Join date : 2011-06-10
Age : 67
Location : Bismarck, ND

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by Danehogle Wed Aug 12, 2020 7:28 am

Yes. Atterbury construction 7c28fc10
Danehogle
Danehogle

Posts : 347
Join date : 2015-07-13
Location : Mt. Vernon Ohio

Allen Barnett, bpettet and dapduh2 like this post

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by Al Wed Aug 12, 2020 8:30 am

Thanks Dane.

Al

Posts : 622
Join date : 2011-06-10
Age : 67
Location : Bismarck, ND

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by weber1b Wed Aug 12, 2020 2:26 pm

My kids would call that concrete evidence.

weber1b

Posts : 558
Join date : 2015-10-03
Location : Ballwin, MO

dapduh2 likes this post

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by -TT- Wed Aug 12, 2020 3:05 pm

So, is this taken from one end, or slightly left of center? How many firing positions so far?

It's certainly a step up from Perry, surface- and shelter-wise!
-TT-
-TT-

Posts : 547
Join date : 2016-10-18

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by Danehogle Thu Aug 13, 2020 3:33 pm

From what I am told, this pic is taken from the center line of range 19 pointing west showing range 20. As I didn’t take the photo, all I can do it compare to the drawings that I have. With my experience from Cardinal, it looks short. Each range should be over 400’ long. With a hill behind the range( right hand side ) and a 2.5 deg slope down the range which is facing south, and no wall between the ranges....that are 35 feet apart.... 
 I Also don’t see any turners or support equipment. 
It is up to you all to shoot there. For me.... I need a LOT more information


Last edited by Danehogle on Thu Aug 13, 2020 3:36 pm; edited 2 times in total (Reason for editing : Spelling)
Danehogle
Danehogle

Posts : 347
Join date : 2015-07-13
Location : Mt. Vernon Ohio

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by james r chapman Fri Aug 14, 2020 11:14 am

Anyone have google earth coordinates that we can track construction?
Looks like a big place
james r chapman
james r chapman
Admin

Posts : 5808
Join date : 2012-01-31
Age : 74
Location : HELL, Michigan

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by TonyH Fri Aug 14, 2020 11:22 am

james r chapman wrote:Anyone have google earth coordinates that we can track construction?
Looks like a big place
Just search for Camp Atterbury in Google Earth....
The imagery presented will be from last year.....not current.
TonyH
TonyH

Posts : 716
Join date : 2018-08-06
Location : Utah's Dixie

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by james r chapman Fri Aug 14, 2020 11:39 am

Sooo, where are the ranges in that massive military installation.,30 thousand acres....
james r chapman
james r chapman
Admin

Posts : 5808
Join date : 2012-01-31
Age : 74
Location : HELL, Michigan

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by Wobbley Fri Aug 14, 2020 12:28 pm

Look to the south and west side of the airstrip.  All sorts of ranges.  Whether it will be a new range or a renovation of an existing range is unknown to me.
Atterbury construction 72773810
Wobbley
Wobbley

Posts : 4027
Join date : 2015-02-13

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by Danehogle Fri Aug 14, 2020 1:53 pm

Atterbury construction Dff92b10
Danehogle
Danehogle

Posts : 347
Join date : 2015-07-13
Location : Mt. Vernon Ohio

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by james r chapman Fri Aug 14, 2020 2:17 pm

Ahh ok.
james r chapman
james r chapman
Admin

Posts : 5808
Join date : 2012-01-31
Age : 74
Location : HELL, Michigan

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by dronning Fri Aug 14, 2020 3:13 pm

Danehogle wrote:Atterbury construction Dff92b10

This image is from 1998 - not current.  Pull up Google Earth zoom in on this location and in the lower left it will give you the image date.
- Dave
dronning
dronning

Posts : 2581
Join date : 2013-03-20
Age : 69
Location : Lakeville, MN

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by TonyH Fri Aug 14, 2020 3:45 pm

This image is from 1998 - not current.  Pull up Google Earth zoom in on this location and in the lower left it will give you the image date.
hence my post above.....Google Earth shows 10/19.....no good for tracking current progress.
TonyH
TonyH

Posts : 716
Join date : 2018-08-06
Location : Utah's Dixie

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by james r chapman Fri Aug 14, 2020 5:54 pm

TonyH wrote:
This image is from 1998 - not current.  Pull up Google Earth zoom in on this location and in the lower left it will give you the image date.
hence my post above.....Google Earth shows 10/19.....no good for tracking current progress.

Yeah, we saw your post.

Others supplied what I meant
james r chapman
james r chapman
Admin

Posts : 5808
Join date : 2012-01-31
Age : 74
Location : HELL, Michigan

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by TonyH Fri Aug 14, 2020 6:22 pm

james r chapman wrote:
TonyH wrote:
This image is from 1998 - not current.  Pull up Google Earth zoom in on this location and in the lower left it will give you the image date.
hence my post above.....Google Earth shows 10/19.....no good for tracking current progress.

Yeah, we saw your post.

Others supplied what I meant
English is a foreign language for me and I do get lost in all your colloquialisms....I apologize for posting.
TonyH
TonyH

Posts : 716
Join date : 2018-08-06
Location : Utah's Dixie

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by STEVE SAMELAK Fri Aug 14, 2020 8:31 pm

I do believe what we call  English is a third language for most of us.   bounce
STEVE SAMELAK
STEVE SAMELAK

Posts : 908
Join date : 2011-06-10

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by Orpanaut Sat Aug 15, 2020 12:55 am

Will the range at Camp Atterbury be hosting any matches other than the NRA National Matches?

Orpanaut

Posts : 181
Join date : 2015-08-05

Back to top Go down

Atterbury construction Empty Re: Atterbury construction

Post by Sponsored content


Sponsored content


Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum